Organisation level |
Organisation |
Organisation documents |
Fully compliant
|
2014-06-05 |
BMGF has made the following documentation related to our work-program publicly available at GatesFoundation.org:
- Annual reports
- Annual letters
- Audited financial statements
- IRS Form 990
- Press releases
- How we define strategy
- How we make grants
- Information sharing approach
- Strategies
- Management Committee and senior leadership
- Our approach to measurement and evaluation
- Our evaluation policy
- What we do not fund
- Our commitment to grantees
- Current grant opportunities
- How we develop strategy
- The strategy lifecycle
|
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
BMGF has made the following documentation related to our work-program publicly available at GatesFoundation.org:
- Annual reports
- Annual letters
- Audited financial statements
- IRS Form 990
- Press releases
- How we define strategy
- How we make grants
- Information sharing approach
- Strategies
- Management Committee and senior leadership
- Our approach to measurement and evaluation
- Our evaluation policy
- What we do not fund
- Our commitment to grantees
- Current grant opportunities
- How we develop strategy
- The strategy lifecycle
|
BMGF has made the following documentation related to our work-program publicly available at GatesFoundation.org:
- Annual reports
- Annual letters
- Audited financial statements
- IRS Form 990
- Press releases
- How we define strategy
- How we make grants
- Information sharing approach
- Strategies
- Management Committee and senior leadership
- Our approach to measurement and evaluation
- Our evaluation policy
- What we do not fund
- Our commitment to grantees
- Current grant opportunities
- How we develop strategy
- The strategy lifecycle
|
No change |
|
Organisation |
Recipient country budgets |
Not applicable
|
|
BMGF does not make forward planning commitments to countries on a rolling basis. |
|
|
Organisation |
Organisation budget |
Partially compliant
|
2014-06-05 |
BMGF has an annual budgeting process that is submitted to our Co-Chairs for approval. We are currently exploring publishing one year forward budget information related to our grants. |
|
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Partially compliant |
Partially compliant |
No change |
Date |
2014-06-01 |
2014-06-05 |
Initial date later |
Notes |
BMGF has an annual budgeting process that is submitted to our Co-Chairs for approval. We are currently exploring publishing one year forward budget information related to our grants. |
BMGF has an annual budgeting process that is submitted to our Co-Chairs for approval. We are currently exploring publishing one year forward budget information related to our grants. |
No change |
|
Organisation |
Funded institution budgets |
Not applicable
|
|
BMGF does not make forward planning commitments to grantees on a rolling basis. |
|
|
Identification |
Activity |
Reporting organisation |
Fully compliant
|
2014-06-05 |
|
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
|
|
No change |
|
Activity |
IATI Identifier |
Fully compliant
|
2014-06-05 |
We publish a globally unique identifier of our activities that consists of a combination of the opportunity ID and OECD organization identifier. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
We publish a globally unique identifier of our activities that consists of a combination of the opportunity ID and OECD organization identifier. |
We publish a globally unique identifier of our activities that consists of a combination of the opportunity ID and OECD organization identifier. |
No change |
|
Activity |
Other Identifier |
Not publishing now
|
|
|
N/A |
|
Basic activity information |
Activity |
Activity dates (End Date) |
Fully compliant
|
2014-06-05 |
We currently publish the planned end date which is then updated as appropriate through the lifecycle of an activity to ensure it is accurate and reflects the actual date. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
We currently publish the planned end date which is then updated as appropriate through the lifecycle of an activity to ensure it is accurate and reflects the actual date. |
We currently publish the planned end date which is then updated as appropriate through the lifecycle of an activity to ensure it is accurate and reflects the actual date. |
No change |
|
Activity |
Activity dates (Start Date) |
Fully compliant
|
2014-06-05 |
We currently publish the planned start date at the time of commitment that is not further adjusted over the lifecycle of an activity. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
We currently publish the planned start date at the time of commitment that is not further adjusted over the lifecycle of an activity. |
We currently publish the planned start date at the time of commitment that is not further adjusted over the lifecycle of an activity. |
No change |
|
Activity |
Participating organisation (Accountable) |
Fully compliant
|
2014-06-05 |
Grantee |
N/A |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
Grantee |
Grantee |
No change |
|
Activity |
Participating organisation (Funding) |
Fully compliant
|
2014-06-05 |
Bill & Melinda Gates Foundation |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
Bill & Melinda Gates Foundation |
Bill & Melinda Gates Foundation |
No change |
|
Activity |
Participating organisation (Implementing) |
Fully compliant
|
2014-06-05 |
The grantee is always an Implementing Organization. Sub-grantees can also be listed as implementing organizations, but these are not reported currently. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
The grantee is always an Implementing Organization. Sub-grantees can also be listed as implementing organizations, but these are not reported currently. |
The grantee is always an Implementing Organization. Sub-grantees can also be listed as implementing organizations, but these are not reported currently. |
No change |
|
Activity |
Participating organisation (Extending) |
Fully compliant
|
2014-06-05 |
Bill & Melinda Gates Foundation |
N/A |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
Bill & Melinda Gates Foundation |
Bill & Melinda Gates Foundation |
No change |
|
Activity |
Title (Agency language) |
Fully compliant
|
2014-06-05 |
We intend to report on the grantee name for the activity title at this stage. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-06-01 |
2014-06-05 |
Initial date later |
Notes |
We intend to report on the grantee name for the activity title at this stage. |
We intend to report on the grantee name for the activity title at this stage. |
No change |
|
Activity |
Title (Recipient language) |
Not publishing now
|
|
There is currently no intention to capture and publish our information in alternate languages. |
|
|
Activity |
Description (Agency language) |
Fully compliant
|
2014-06-05 |
Our current description addresses activities and / or purpose. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
Our current description addresses activities and / or purpose. |
Our current description addresses activities and / or purpose. |
No change |
|
Activity |
Description (Recipient language) |
Not publishing now
|
|
There is currently no intention to capture and publish our information in alternate languages. |
|
|
Activity |
Contact information |
Fully compliant
|
2014-06-05 |
We publish for each of our activities our contact details as info@gatesfoundation.org. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
We publish for each of our activities our contact details as info@gatesfoundation.org. |
We publish for each of our activities our contact details as info@gatesfoundation.org. |
No change |
|
Activity |
Activity status |
Fully compliant
|
2014-06-05 |
Our activity status approximates the activity lifecycle stages defined. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-06-01 |
2014-06-05 |
Initial date later |
Notes |
Our activity status approximates the activity lifecycle stages defined. |
Our activity status approximates the activity lifecycle stages defined. |
No change |
|
Geopolitical information |
Activity |
Recipient country |
Fully compliant
|
2014-06-05 |
We do capture the countries for whose benefit the aid flows are provided, as applicable. IATI only accepts reporting at the country or region level for each activity, which does not align with our reporting of potentially different countries and regions for an activity. Therefore for certain activities we have only been able to report the relevant regions or countries as applicable, but not both. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
We do capture the countries for whose benefit the aid flows are provided, as applicable. IATI only accepts reporting at the country or region level for each activity, which does not align with our reporting of potentially different countries and regions for an activity. Therefore for certain activities we have only been able to report the relevant regions or countries as applicable, but not both. |
We do capture the countries for whose benefit the aid flows are provided, as applicable. IATI only accepts reporting at the country or region level for each activity, which does not align with our reporting of potentially different countries and regions for an activity. Therefore for certain activities we have only been able to report the relevant regions or countries as applicable, but not both. |
No change |
|
Activity |
Recipient region |
Fully compliant
|
2014-06-05 |
Recipient regional classification includes either a geographical region or 'world.' IATI only accepts reporting at the country or region level for each activity, which does not align with our reporting of potentially different countries and regions for an activity. Therefore for certain activities we have only been able to report the relevant regions or countries as applicable, but not both. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
Recipient regional classification includes either a geographical region or 'world.' IATI only accepts reporting at the country or region level for each activity, which does not align with our reporting of potentially different countries and regions for an activity. Therefore for certain activities we have only been able to report the relevant regions or countries as applicable, but not both. |
Recipient regional classification includes either a geographical region or 'world.' IATI only accepts reporting at the country or region level for each activity, which does not align with our reporting of potentially different countries and regions for an activity. Therefore for certain activities we have only been able to report the relevant regions or countries as applicable, but not both. |
No change |
|
Activity |
Sub-national geographic location |
Not publishing now
|
|
We do capture sub-national geographical information of the target locations of our activities but only for select countries. |
|
|
Classifications |
Activity |
Flow type |
Fully compliant
|
2014-06-05 |
We publish the type of flow in accordance with the OECD CRS standards. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
We publish the type of flow in accordance with the OECD CRS standards. |
We publish the type of flow in accordance with the OECD CRS standards. |
No change |
|
Activity |
Sector (DAC CRS) |
Fully compliant
|
2014-06-05 |
We publish the OECD CRS purpose codes. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
We publish the OECD CRS purpose codes. |
We publish the OECD CRS purpose codes. |
No change |
|
Activity |
Sector (Agency specific) |
Not publishing now
|
|
We do capture agency specific sector / strategy codes, however further analysis is required to determine if in the future it can be published. |
N/A |
|
Activity |
Tied aid status |
Fully compliant
|
2014-06-05 |
All our aid is untied. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
All our aid is untied. |
All our aid is untied. |
No change |
|
Activity |
Policy marker |
Not applicable
|
|
The current CRS policy markers are not applicable to the nature of our programmatic work. We instead utilize the OECD CRS purpose codes to designate the thematic classifications. |
|
|
Activity |
Collaboration type |
Fully compliant
|
2014-06-05 |
We utilize two identifiers; private sector outflows and multilateral aid. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
We utilize two identifiers; private sector outflows and multilateral aid. |
We utilize two identifiers; private sector outflows and multilateral aid. |
No change |
|
Activity |
Finance type |
Fully compliant
|
2014-06-05 |
We publish the type of finance which we derive based on the Opportunity Type. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
We publish the type of finance which we derive based on the Opportunity Type. |
We publish the type of finance which we derive based on the Opportunity Type. |
No change |
|
Activity |
Aid type |
Fully compliant
|
2014-06-05 |
We publish the type of aid in accordance with the OECD CRS standards. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
We publish the type of aid in accordance with the OECD CRS standards. |
We publish the type of aid in accordance with the OECD CRS standards. |
No change |
|
Financial |
Activity |
Budget identifier (Administrative/functional) |
|
|
|
N/A |
|
Activity |
Budget identifier (Economic) |
|
|
|
N/A |
|
Activity |
Budget |
Fully compliant
|
2014-06-05 |
BMGF publishes commitments; the actual amount committed to a recipient agency on a grant by grant basis. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
BMGF publishes commitments; the actual amount committed to a recipient agency on a grant by grant basis. |
BMGF publishes commitments; the actual amount committed to a recipient agency on a grant by grant basis. |
No change |
|
Activity |
Planned disbursement |
Fully compliant
|
2014-06-05 |
We are currently preparing to publish one year forward planned expenditures. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-06-01 |
2014-06-05 |
Initial date later |
Notes |
We are currently preparing to publish one year forward planned expenditures. |
We are currently preparing to publish one year forward planned expenditures. |
No change |
|
Financial transaction |
Activity |
Transactions (Reimbursement) |
Fully compliant
|
2014-06-05 |
Our systems allow for the publication of reimbursements or negative disbursements, however OECD reporting requires negative disbursements to be excluded where they are not able to be fully offset against disbursements in a reporting period. We fully account for loan repayments. We do not intend to report negative disbursements to IATI related to the return of other disbursed funds as this consists typically of small immaterial transactions. |
N/A |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-06-01 |
2014-06-05 |
Initial date later |
Notes |
Our systems allow for the publication of reimbursements or negative disbursements, however OECD reporting requires negative disbursements to be excluded where they are not able to be fully offset against disbursements in a reporting period. We fully account for loan repayments. We do not intend to report negative disbursements to IATI related to the return of other disbursed funds as this consists typically of small immaterial transactions. |
Our systems allow for the publication of reimbursements or negative disbursements, however OECD reporting requires negative disbursements to be excluded where they are not able to be fully offset against disbursements in a reporting period. We fully account for loan repayments. We do not intend to report negative disbursements to IATI related to the return of other disbursed funds as this consists typically of small immaterial transactions. |
No change |
|
Activity |
Transactions (Disbursement / Expenditure) |
Fully compliant
|
2014-06-05 |
BMGF currently publishes disbursements, the actual amount placed at the disposal of a recipient agency. We do not currently capture, nor anticipate capturing, expenditures related to outlays by an implementing agency on goods and services. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
BMGF currently publishes disbursements, the actual amount placed at the disposal of a recipient agency. We do not currently capture, nor anticipate capturing, expenditures related to outlays by an implementing agency on goods and services. |
BMGF currently publishes disbursements, the actual amount placed at the disposal of a recipient agency. We do not currently capture, nor anticipate capturing, expenditures related to outlays by an implementing agency on goods and services. |
No change |
|
Activity |
Transactions (Incoming Funds) |
Fully compliant
|
2014-06-05 |
BMGF does publish incoming funds as part of our annual tax Form 990PF reporting and we are currently preparing to also publish under the IATI standard.
|
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-06-01 |
2014-06-05 |
Initial date later |
Notes |
BMGF does publish incoming funds as part of our annual tax Form 990PF reporting and we are currently preparing to also publish under the IATI standard.
|
BMGF does publish incoming funds as part of our annual tax Form 990PF reporting and we are currently preparing to also publish under the IATI standard.
|
No change |
|
Activity |
Transactions (Commitment) |
Fully compliant
|
2014-06-05 |
BMGF publishes commitments; the actual amount committed to a recipient agency. Due to concerns of security and safety, privacy, confidentiality, legal privilege, commercial sensitivity and influence on outcomes we do not publish the specific terms and conditions of our activities. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
BMGF publishes commitments; the actual amount committed to a recipient agency. Due to concerns of security and safety, privacy, confidentiality, legal privilege, commercial sensitivity and influence on outcomes we do not publish the specific terms and conditions of our activities. |
BMGF publishes commitments; the actual amount committed to a recipient agency. Due to concerns of security and safety, privacy, confidentiality, legal privilege, commercial sensitivity and influence on outcomes we do not publish the specific terms and conditions of our activities. |
No change |
|
Activity |
Transactions (Loan repayment / interest repayment) |
Fully compliant
|
2014-06-05 |
We do publish loan repayments. |
N/A |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-02-01 |
2014-06-05 |
Initial date later |
Notes |
We do publish loan repayments. |
We do publish loan repayments. |
No change |
|
Related documents |
Activity |
Activity website |
Fully compliant
|
2014-06-05 |
We currently capture grantee information that includes the related website. We presently publish the grantee website information on the GatesFoundation.org website and are also planning to publish this information in the IATI XML format. |
N/A |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Fully compliant |
Fully compliant |
No change |
Date |
2014-06-01 |
2014-06-05 |
Initial date later |
Notes |
We currently capture grantee information that includes the related website. We presently publish the grantee website information on the GatesFoundation.org website and are also planning to publish this information in the IATI XML format. |
We currently capture grantee information that includes the related website. We presently publish the grantee website information on the GatesFoundation.org website and are also planning to publish this information in the IATI XML format. |
No change |
|
Activity |
Related activity |
Not applicable
|
|
Although we do have multi-funded projects our reporting is by activity with links related to the specific activity. |
N/A |
|
Activity |
Activity documents |
Not publishing now
|
2014-06-05 |
We currently do not centrally publish documents related to our activities due to concerns of security and safety, privacy, confidentiality, legal privilege, commercial sensitivity and influence on outcomes. |
1 |
changes
Implementation schedules were amended when information provided was incomplete, not parsed properly or required interpretation.
Component | Initial | Corrected | Change reason |
Status |
Not publishing now |
Not publishing now |
No change |
Date |
None |
2014-06-05 |
Initial date later |
Notes |
We currently do not centrally publish documents related to our activities due to concerns of security and safety, privacy, confidentiality, legal privilege, commercial sensitivity and influence on outcomes. |
We currently do not centrally publish documents related to our activities due to concerns of security and safety, privacy, confidentiality, legal privilege, commercial sensitivity and influence on outcomes. |
No change |
|
Performance |
Activity |
Conditions (Attached Y/N) |
Not publishing now
|
|
Special conditions may be attached to our activities which due to concerns of security and safety, privacy, confidentiality, legal privilege, commercial sensitivity and influence on outcomes, we have no present intention of making public. |
|
|
Activity |
Conditions (Text) |
Not publishing now
|
|
|
|
|
Activity |
Results |
Not publishing now
|
|
Further analysis is required to determine the optimal approach we will adopt in relation to our results data. |
|
|